Home > Technology Innovation > Smart Construction

Smart Construction

BIM based intelligent construction site platform management system can be used for project management, with comprehensive application BIM, Internet of things, cloud computing, big data, mobile communication and other technical means integrate all kinds of data into the smart site cloud platform by arranging all kinds of sensor equipment and wireless sensor network at the construction site. The cloud server intelligently processes the data and links with the feedback control mechanism at the same time. Through computers and mobile phones, the construction site personnel, materials, equipment Comprehensive monitoring, analysis and control of construction management.


w66.利来(中国区)_来利国际旗舰厅
w66.利来(中国区)_来利国际旗舰厅

 

w66.利来(中国区)_来利国际旗舰厅 Labor management

 

Through the intelligent access control system, the real name system management of labor personnel is realized, personal information of workers is collected, and data such as daily number of employees and types of work are counted.

 

w66.利来(中国区)_来利国际旗舰厅

 

 

w66.利来(中国区)_来利国际旗舰厅 Material access management

 

Through the intelligent pump and vehicle identification system, the material in and out of the field is monitored to realize the material cost monitoring.

 

w66.利来(中国区)_来利国际旗舰厅

 

 

w66.利来(中国区)_来利国际旗舰厅 Quality and safety site information management

 

The management personnel shall timely generate a rectification notice for the site problems through the mobile app and issue it to the responsible person. After the site rectification is completed, they can take photos and reply to the management personnel. Relevant quality / safety rectification data can be integrated and displayed on the smart site platform.

 

w66.利来(中国区)_来利国际旗舰厅

 

 

w66.利来(中国区)_来利国际旗舰厅 Special equipment management

 

The tower crane safety monitoring and early warning system is installed on the tower crane to realize the functions of single tower crane operation early warning, group tower operation collision real-time early warning and hoisting whole process early warning, and accumulate big data of the tower crane team to assist in the analysis of tower crane work efficiency.

 

w66.利来(中国区)_来利国际旗舰厅

 

 

w66.利来(中国区)_来利国际旗舰厅 Environmental monitoring and energy consumption monitoring system

 

The detection equipment on the field equipment can realize the collection of air quality detection, water and electricity consumption, etc.

 